Mobile Shelving Dismantle, Transport and Rebuild for London Art Gallery

Storage Essentials were approached by a London Art Gallery who wanted to us to dismantle their mobile shelving system, transport it and then re-build it in another location.
The client supplied several images showing the type of mobile shelving system. We were able to ascertain the model was Dexion Impex with a grouted track and infill floor. We estimated it would be approximately 30 years old.
We carefully dismantled all the shelving, mobile bases, track and flooring and set-a-side for transporting to the new facility.
Once at the new site, our engineer’s laid the track and floor, ensuring it was 100% level. They then rebuilt the mobile bases and shelving without the need for any additional materials.
Each bay of shelving had to be built in the exact same profile as it came down. The installation team took photographs of each bay when dismantling and measured and recorded the shelf pitches. They were then able to recreate an identical system in the new location. On completion our engineer’s gave the system a thorough service to ensure everything was working satisfactorily and issued a 12 month warranty.
Our installation supervisor, Jez Sheehan, was given a glowing reference by our client, who praised the way he and his team approached the installation and completed it within a very tight window before Christmas.